COI.
close Submit Innovation
close
Real Estate verified Verified Outcome TRL 9

Autonomous Rebar Tying Robot

domain Client: Bridge / Road Contractors handshake Provider: Advanced Construction Robotics schedule Deploy: 2018-Present
92 Impact
Enterprise Ready
Evidence Score: 5/10
Strength: High

Executive Summary

ANALYST: COI RESEARCH

Deployment of an autonomous gantry robot (TyBOT) that self-navigates bridge decks to identify and tie rebar intersections, replacing manual labor in critical path infrastructure work.

rate_review Analyst Verdict

"Targeted automation for a specific pain point. Tying rebar is back-breaking, repetitive, and on the critical path (concrete can't be poured until it's done). TyBOT works 24/7 without fatigue, effectively acting as a force multiplier for the crew."

lock
Full Audit Report Available Includes Risk Register, Technical Specs & Compliance Data.

warning The Challenge

Bridge deck construction requires tying millions of rebar intersections by hand. It causes repetitive strain injuries and is slow. Finding labor willing to do this work is increasingly difficult. Delays in rebar tying stall the entire paving train.

psychology The Solution

The TyBOT robot is placed on the screed rails. It uses computer vision to see the rebar grid. It moves autonomously, stopping at each intersection to tie the wire. It requires no pre-mapping or BIM model; it just 'sees and ties'. One technician supervises the robot while it does the work of 6-8 people.

settings_suggest Technical & Deployment Specs

Integrations
None
Deployment Model
RaaS / Lease
Data Classification
Operational Data
Estimated TCO / ROI
Lease Cost
POC Summary ( to )

"N/A"

shield Risk Register & Mitigation

Risk Factor Severity Mitigation Strategy
Weather Low Ruggedized IP65 design.
Rebar Variance Medium Vision system tolerances.

trending_up Impact Trajectory

Audited value realization curve

1,100 ties per hour (consistent output) Verified Outcome
Primary KPIZero repetitive strain injuries
Audit CycleSetup time < 1 hour (no pre-mapping)

policy Compliance & Gov

  • Standards: OSHA
  • Maturity (TRL): 9
  • Evidence Score: 5/10
  • Data Class: Operational Data

folder_shared Verified Assets

description
Verified Case Study
PDF • Version 1
lock
verified_user
Technical Audit
PDF • Audited
lock
Security Architecture

The "Blind Verification" Protocol

How we verified these outcomes for Bridge / Road Contractors without exposing sensitive IP or identities.

Private
lock_person

1. Raw Evidence

Audit ID: #PRIV-679
Evidence: Direct SQL Logs
Public
public

2. Verified Asset

Outcome: Verified
Ref ID: #COI-679

Strategic Action Center

Identify your current stage and take the next step.

rocket_launch
Replicate This Success
Want similar results? Request a deployment consultation.
psychology_alt
Submit Challenge
Have a different problem? Submit your problem statement.
publish
Publish Case Study
Submit your own verified evidence.
thumb_up
Verify Impact
Audit your existing solution.