COI.
close Submit Innovation
close
Aerospace verified Verified Outcome TRL 9

Mixed Reality for Aircraft Design & Training

domain Client: A leading global aerospace manufacturer handshake Provider: Microsoft Azure / HoloLens 2 schedule Deploy: Q1 2020 (Expansion)
91 Impact
Enterprise Ready
Evidence Score: 5/10
Strength: High

Executive Summary

ANALYST: COI RESEARCH

The manufacturer deployed Azure Mixed Reality services and HoloLens 2 headsets to assist design engineers and shop floor workers. By overlaying digital 3D schematics onto physical aircraft sections, workers can verify installations (brackets, wiring) faster and validate designs without physical mockups.

rate_review Analyst Verdict

"A high-value use of AR in industrial workflows. It replaces 2D paper drawings (which require interpretation) with 3D spatial overlays (which provide certainty). This significantly reduces rework costs in the capital-intensive aerospace assembly process."

lock
Full Audit Report Available Includes Risk Register, Technical Specs & Compliance Data.

warning The Challenge

Aircraft assembly involves thousands of brackets and wires. validating installation using 2D paper drawings is slow and error-prone. Physical mockups for design validation are expensive and slow to build.

psychology The Solution

Designers export 3D models to Azure Remote Rendering. Workers wear HoloLens 2 headsets. The system uses Azure Spatial Anchors to lock the digital model to the physical fuselage. Workers see exactly where a bracket should be drilled.

settings_suggest Technical & Deployment Specs

Integrations
Catia, PLM
Deployment Model
Hybrid Mixed Reality
Data Classification
CAD / IP
Estimated TCO / ROI
Medium
POC Summary (2018-01-01 to 2019-01-01)

"Initial trials in A350 XWB program."

shield Risk Register & Mitigation

Risk Factor Severity Mitigation Strategy
Hardware Adoption Medium Ergonomic training; limited session times.
Data Security High Encrypted streaming of CAD data; no local storage on headset.

trending_up Impact Trajectory

Audited value realization curve

Design validation time reduced by 80% Verified Outcome
Primary KPIInstallation speed increased by 30%
Audit CycleReduction in manufacturing errors/rework

policy Compliance & Gov

  • Standards: ITAR (where applicable)
  • Maturity (TRL): 9
  • Evidence Score: 5/10
  • Data Class: CAD / IP

folder_shared Verified Assets

description
Verified Case Study
PDF • Version 1
lock
verified_user
Technical Audit
PDF • Audited
lock
Security Architecture

The "Blind Verification" Protocol

How we verified these outcomes for A leading global aerospace manufacturer without exposing sensitive IP or identities.

Private
lock_person

1. Raw Evidence

Audit ID: #PRIV-840
Evidence: Direct SQL Logs
Public
public

2. Verified Asset

Outcome: Verified
Ref ID: #COI-840

Strategic Action Center

Identify your current stage and take the next step.

rocket_launch
Replicate This Success
Want similar results? Request a deployment consultation.
psychology_alt
Submit Challenge
Have a different problem? Submit your problem statement.
publish
Publish Case Study
Submit your own verified evidence.
thumb_up
Verify Impact
Audit your existing solution.