Generative Construction Scheduling

domain Client: Major Infrastructure Contractors handshake Provider: ALICE Technologies schedule Deploy: 2019-Present
95 Impact
Enterprise Ready
Evidence Score: 5/10
Strength: High

Executive Summary

ANALYST: COI RESEARCH

Application of AI to simulate millions of construction schedule permutations (Optioneering) to find the most efficient path, allowing projects to recover delays by re-sequencing resources.

rate_review Analyst Verdict

"Moves scheduling from 'deterministic' (Gantt charts) to 'probabilistic'. In complex infrastructure, there are too many variables for a human to optimize. ALICE acts as a 'schedule wargame' engine, proving that adding a second crane or changing shift work saves X days and Y dollars."

lock
Full Audit Report Available Includes Risk Register, Technical Specs & Compliance Data.

warning The Challenge

Large construction projects (airports, tunnels) are notoriously delayed. Traditional scheduling (Primavera P6) is static; if a delay occurs, rescheduling is a manual, weeks-long process. Project managers could not mathematically determine the optimal recovery plan (e.g., is it cheaper to pay overtime or rent more equipment?).

psychology The Solution

Imported the BIM model and schedule constraints into ALICE. The AI engine runs thousands of simulations, exploring every possible sequence of tasks. It outputs a 'Pareto frontier' of options (Fastest, Cheapest, Balanced). If a delay happens, the team re-runs the simulation to find the best recovery path instantly.

settings_suggest Technical & Deployment Specs

Integrations
Oracle Primavera P6
Deployment Model
SaaS
Data Classification
Project Schedule
Estimated TCO / ROI
Project Fee
POC Summary ( to )

"N/A"

shield Risk Register & Mitigation

Risk Factor Severity Mitigation Strategy
Data Input Quality Medium Strict P6 schedule hygiene.
Adoption Medium Training schedulers.

trending_up Impact Trajectory

Audited value realization curve

Recovered 84 days of schedule delay on major project Verified Outcome
Primary KPI$30M in estimated construction cost savings
Audit CycleSimulation of 600M+ schedule options

policy Compliance & Gov

  • Standards: Construction Contracts
  • Maturity (TRL): 9
  • Evidence Score: 5/10
  • Data Class: Project Schedule

folder_shared Verified Assets

description
Verified Case Study
PDF • Version 1
lock
verified_user
Technical Audit
PDF • Audited
lock
Security Architecture

The "Blind Verification" Protocol

How we verified these outcomes for Major Infrastructure Contractors without exposing sensitive IP or identities.

Private
lock_person

1. Raw Evidence

Audit ID: #PRIV-674
Evidence: Direct SQL Logs
Public
public

2. Verified Asset

Outcome: Verified
Ref ID: #COI-674

Strategic Action Center

Identify your current stage and take the next step.

rocket_launch
Replicate This Success
Want similar results? Request a deployment consultation.
psychology_alt
Submit Challenge
Have a different problem? Submit your problem statement.
publish
Publish Case Study
Submit your own verified evidence.
thumb_up
Verify Impact
Audit your existing solution.