domain Client: Retail / Fuel Stations handshake Provider: FreeWire Technologies schedule Deploy: 2020-Present
91 Impact
Enterprise Ready
Evidence Score: 5/10
Strength: High

Executive Summary

ANALYST: COI RESEARCH

Deployment of EV fast chargers with integrated battery storage, allowing ultrafast charging (150kW+) using existing low-voltage grid connections, bypassing the need for expensive substation upgrades.

rate_review Analyst Verdict

"Solves the 'last mile' power problem. Installing a 150kW charger usually requires a massive grid upgrade ($50k-$200k) and months of permitting. FreeWire works on a standard outlet, trickle charging its battery to blast power into the car when needed."

lock
Full Audit Report Available Includes Risk Register, Technical Specs & Compliance Data.

warning The Challenge

Retailers (gas stations, convenience stores) want to offer EV fast charging. However, their existing grid connection is often weak (low voltage). Upgrading the transformer to support 150kW+ chargers is prohibitively expensive and takes 12-18 months of utility coordination. This stalled rollout in rural or older areas.

psychology The Solution

Deployed the Boost Charger. It connects to standard low-power infrastructure (27kW). It sips power continuously to charge its internal 160kWh battery. When a car plugs in, it discharges from the battery at high speed (150kW+). This decouples the grid limit from the charging speed.

settings_suggest Technical & Deployment Specs

Integrations
OCPP
Deployment Model
Hardware
Data Classification
Charging Data
Estimated TCO / ROI
Hardware cost
POC Summary ( to )

"N/A"

shield Risk Register & Mitigation

Risk Factor Severity Mitigation Strategy
Battery Throughput Medium Not suitable for 100% duty cycle sites.
Lifespan Low Active thermal management.

trending_up Impact Trajectory

Audited value realization curve

65% reduction in capital costs vs grid upgrade Verified Outcome
Primary KPIInstallation in weeks vs months
Audit CycleAvoidance of utility demand charges

policy Compliance & Gov

  • Standards: UL / CE
  • Maturity (TRL): 9
  • Evidence Score: 5/10
  • Data Class: Charging Data

folder_shared Verified Assets

description
Verified Case Study
PDF • Version 1
lock
verified_user
Technical Audit
PDF • Audited
lock
Security Architecture

The "Blind Verification" Protocol

How we verified these outcomes for Retail / Fuel Stations without exposing sensitive IP or identities.

Private
lock_person

1. Raw Evidence

Audit ID: #PRIV-693
Evidence: Direct SQL Logs
Public
public

2. Verified Asset

Outcome: Verified
Ref ID: #COI-693

Strategic Action Center

Identify your current stage and take the next step.

rocket_launch
Replicate This Success
Want similar results? Request a deployment consultation.
psychology_alt
Submit Challenge
Have a different problem? Submit your problem statement.
publish
Publish Case Study
Submit your own verified evidence.
thumb_up
Verify Impact
Audit your existing solution.