COI.
close Submit Innovation
close
Energy verified Verified Outcome TRL 9

Autonomous Drone-in-a-Box Inspection

domain Client: Electric Utility handshake Provider: Percepto schedule Deploy: 2020-Present
90 Impact
Enterprise Ready
Evidence Score: 5/10
Strength: High

Executive Summary

ANALYST: COI RESEARCH

Deployment of autonomous drone stations at substations that launch on schedule or on-demand to inspect assets, reducing truck rolls and speeding up storm recovery.

rate_review Analyst Verdict

"Achieved the 'Holy Grail' of drones: BVLOS (Beyond Visual Line of Sight) approval. This moves drones from a manual tool (pilot with a joystick) to an automated infrastructure asset. Crucial for hurricane hardening."

lock
Full Audit Report Available Includes Risk Register, Technical Specs & Compliance Data.

warning The Challenge

After hurricanes, FPL needs to assess damage to thousands of substations instantly to direct repair crews. Dispatching humans takes days if roads are blocked. Routine inspections for corrosion/heat are also labor-intensive and infrequent.

psychology The Solution

Installed Percepto 'Sparrow' drone stations. These rugged boxes house, charge, and launch the drone automatically. The drone flies a pre-programmed route using computer vision to check insulators, fences, and thermal hotspots. After a storm, it launches immediately to survey damage. It uploads data to the cloud for AI analysis.

settings_suggest Technical & Deployment Specs

Integrations
Maximo / GIS
Deployment Model
Hardware + SaaS
Data Classification
Visual / Thermal
Estimated TCO / ROI
Unit Cost
POC Summary ( to )

"N/A"

shield Risk Register & Mitigation

Risk Factor Severity Mitigation Strategy
Regulatory Revocation Medium Strict safety case adherence.
Hardware Failure Low Parachute systems.

trending_up Impact Trajectory

Audited value realization curve

First utility to receive nationwide BVLOS waiver Verified Outcome
Primary KPIReduction in post-storm assessment time
Audit CycleDaily autonomous inspections without human pilots

policy Compliance & Gov

  • Standards: FAA Part 107 / BVLOS
  • Maturity (TRL): 9
  • Evidence Score: 5/10
  • Data Class: Visual / Thermal

folder_shared Verified Assets

description
Verified Case Study
PDF • Version 1
lock
verified_user
Technical Audit
PDF • Audited
lock
Security Architecture

The "Blind Verification" Protocol

How we verified these outcomes for Electric Utility without exposing sensitive IP or identities.

Private
lock_person

1. Raw Evidence

Audit ID: #PRIV-701
Evidence: Direct SQL Logs
Public
public

2. Verified Asset

Outcome: Verified
Ref ID: #COI-701

Strategic Action Center

Identify your current stage and take the next step.

rocket_launch
Replicate This Success
Want similar results? Request a deployment consultation.
psychology_alt
Submit Challenge
Have a different problem? Submit your problem statement.
publish
Publish Case Study
Submit your own verified evidence.
thumb_up
Verify Impact
Audit your existing solution.