COI.
close Submit Innovation
close
Energy verified Verified Outcome TRL 9

Smart Sewer Optimization (Digital Twin)

domain Client: Municipal Wastewater Utility handshake Provider: Xylem (EmNet) schedule Deploy: 2012-Present
96 Impact
Enterprise Ready
Evidence Score: 5/10
Strength: Very High

Executive Summary

ANALYST: COI RESEARCH

Deployment of a distributed sensor network and AI control logic to optimize sewage flow in real-time, preventing Combined Sewer Overflows (CSOs) without building new tunnels.

rate_review Analyst Verdict

"The definitive case study for 'Smart Water'. Instead of spending $500M on concrete tunnels (gray infrastructure) to store stormwater, the city spent a fraction on sensors and algorithms (digital infrastructure) to use existing pipe capacity more effectively."

lock
Full Audit Report Available Includes Risk Register, Technical Specs & Compliance Data.

warning The Challenge

During heavy rain, the city's combined sewers (rain + sewage) would overflow into the river (CSO), violating EPA mandates. The traditional engineering solution was to build massive underground storage tunnels costing nearly $1 billion, which would burden ratepayers for decades.

psychology The Solution

Installed 165+ smart sensors and automated gates/valves throughout the sewer network. The Xylem BLU-X platform uses AI to predict flows based on rain forecasts. During a storm, it dynamically re-routes sewage to underutilized parts of the network (in-line storage), effectively using the pipes themselves as a storage tank.

settings_suggest Technical & Deployment Specs

Integrations
SCADA
Deployment Model
Hardware + Software
Data Classification
Sensor / Flow
Estimated TCO / ROI
High (Initial install)
POC Summary ( to )

"N/A"

shield Risk Register & Mitigation

Risk Factor Severity Mitigation Strategy
Cybersecurity High Air-gapped control networks.
Sensor Maint Medium Confined space entry protocols.

trending_up Impact Trajectory

Audited value realization curve

Eliminated 80% of sewer overflows (1B gallons/year) Verified Outcome
Primary KPISaved ~$500M in avoided capital construction costs
Audit CycleE. coli concentration in river dropped by 50%

policy Compliance & Gov

  • Standards: EPA Consent Decree
  • Maturity (TRL): 9
  • Evidence Score: 5/10
  • Data Class: Sensor / Flow

folder_shared Verified Assets

description
Verified Case Study
PDF • Version 1
lock
verified_user
Technical Audit
PDF • Audited
lock
Security Architecture

The "Blind Verification" Protocol

How we verified these outcomes for Municipal Wastewater Utility without exposing sensitive IP or identities.

Private
lock_person

1. Raw Evidence

Audit ID: #PRIV-697
Evidence: Direct SQL Logs
Public
public

2. Verified Asset

Outcome: Verified
Ref ID: #COI-697

Strategic Action Center

Identify your current stage and take the next step.

rocket_launch
Replicate This Success
Want similar results? Request a deployment consultation.
psychology_alt
Submit Challenge
Have a different problem? Submit your problem statement.
publish
Publish Case Study
Submit your own verified evidence.
thumb_up
Verify Impact
Audit your existing solution.